TrAIL transmission lines facility analysis

Managed the independent reliability needs assessment of the proposed 265-mile 502 Junction-Mt. Storm-Meadow Brook-Loudoun 500 kV Transmission Line for the Virginia State Corporation Commission. The work involved load flow modeling of multiple transmission, generation, and demand response alternatives scenarios capable of reliably serving the forecast load. Prepared and presented testimony as to the ability of PJM’s RPM demand response programs to provide the same level of long-term reliability as that of the proposed line.